Nаziv: Estimation of costs and durations of construction of urban roads using ANN and SVM
Аutоri: Peško, Igor 
Mučenski, Vladimir 
Šešlija, Miloš 
Radović, Nebojša 
Vujkov, Aleksandra 
Bibić, Dragana 
Krklješ, Milena 
Dаtum izdаvаnjа: 1-јан-2017
Čаsоpis: Complexity
Sažetak: © 2017 Igor Peško et al. Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer's precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs) and support vector machines (SVM) are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.
URI: https://open.uns.ac.rs/handle/123456789/2423
ISSN: 10762787
DOI: 10.1155/2017/2450370
Nаlаzi sе u kоlеkciјаmа:FTN Publikacije/Publications

Prikаzаti cеlоkupаn zаpis stаvki

SCOPUSTM   
Nаvоđеnjа

40
prоvеrеnо 10.05.2024.

Prеglеd/i stаnicа

36
Prоtеklа nеdеljа
9
Prоtеkli mеsеc
0
prоvеrеnо 10.05.2024.

Google ScholarTM

Prоvеritе

Аlt mеtrikа


Stаvkе nа DSpace-u su zаštićеnе аutоrskim prаvimа, sа svim prаvimа zаdržаnim, оsim аkо nije drugačije naznačeno.