Назив: Estimation of costs and durations of construction of urban roads using ANN and SVM
Аутори: Peško, Igor 
Mučenski, Vladimir 
Šešlija, Miloš 
Radović, Nebojša 
Vujkov, Aleksandra 
Bibić, Dragana 
Krklješ, Milena 
Датум издавања: 1-јан-2017
Часопис: Complexity
Сажетак: © 2017 Igor Peško et al. Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer's precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs) and support vector machines (SVM) are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.
URI: https://open.uns.ac.rs/handle/123456789/2423
ISSN: 10762787
DOI: 10.1155/2017/2450370
Налази се у колекцијама:FTN Publikacije/Publications

Приказати целокупан запис ставки

SCOPUSTM   
Навођења

40
проверено 10.05.2024.

Преглед/и станица

36
Протекла недеља
9
Протекли месец
0
проверено 10.05.2024.

Google ScholarTM

Проверите

Алт метрика


Ставке на DSpace-у су заштићене ауторским правима, са свим правима задржаним, осим ако није другачије назначено.