Назив: | Estimation of costs and durations of construction of urban roads using ANN and SVM | Аутори: | Peško, Igor Mučenski, Vladimir Šešlija, Miloš Radović, Nebojša Vujkov, Aleksandra Bibić, Dragana Krklješ, Milena |
Датум издавања: | 1-јан-2017 | Часопис: | Complexity | Сажетак: | © 2017 Igor Peško et al. Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer's precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs) and support vector machines (SVM) are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively. | URI: | https://open.uns.ac.rs/handle/123456789/2423 | ISSN: | 10762787 | DOI: | 10.1155/2017/2450370 |
Налази се у колекцијама: | FTN Publikacije/Publications |
Приказати целокупан запис ставки
SCOPUSTM
Навођења
40
проверено 10.05.2024.
Преглед/и станица
36
Протекла недеља
9
9
Протекли месец
0
0
проверено 10.05.2024.
Google ScholarTM
Проверите
Алт метрика
Ставке на DSpace-у су заштићене ауторским правима, са свим правима задржаним, осим ако није другачије назначено.