Please use this identifier to cite or link to this item: https://open.uns.ac.rs/handle/123456789/6424
Title: Masonry construction remedial measures in case of a multi-story housing facility caused by floor extension process
Authors: Jakšić, Željko 
Ladjinović D.
Trivunić, Milan 
Harmati N.
Vatin N.
Issue Date: 1-Jan-2015
Journal: Procedia Engineering
Abstract: © 2015 Published by Elsevier Ltd. This paper presents remedial measures of a multi story housing facility located in Novi Sad, Serbia. The analyzed building was built in traditional masonry construction with precast rib ceiling including unreinforced slab. The damage was caused after the floor extension (overbuilding) process of the existing facility, expressed through cracks on constructive walls. The cause of such damage is a non-analytical approach during upgrade. The work presents a case study of the applied measures at conditions when the material incorporated in the existing part of the building is not of adequate quality. The specificity of this recovery was that during the execution the flats' users remained in their apartments.
URI: https://open.uns.ac.rs/handle/123456789/6424
DOI: 10.1016/j.proeng.2015.08.252
Appears in Collections:FTN Publikacije/Publications

Show full item record

SCOPUSTM   
Citations

9
checked on May 3, 2024

Page view(s)

19
Last Week
7
Last month
0
checked on May 10, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.