Mоlimо vаs kоristitе оvај idеntifikаtоr zа citirаnjе ili оvај link dо оvе stаvkе:
https://open.uns.ac.rs/handle/123456789/2585
Nаziv: | Risk in determining the duration of manually performed construction activities | Аutоri: | Flasar A. Vuković, Darko |
Dаtum izdаvаnjа: | 1-јан-2002 | Čаsоpis: | The Organization and Management of Construction: Shaping Theory and Practice: Volume Two: Managing the Construction Project and Managing Risk | Sažetak: | © 1996 Taylor and Francis. Unit work times for manually performed building activities are often determined as an average of on site measured time spent, for accomplishing the work. The activity duration is computed using this average. A procedure of computing the risk that this activity duration may be exceeded is explained. An example of computing the activity duration, and the related risk, when building a veneered facade wall is given. | URI: | https://open.uns.ac.rs/handle/123456789/2585 | ISBN: | 9781135813840 | DOI: | 10.4324/9780203477090 |
Nаlаzi sе u kоlеkciјаmа: | Naučne i umetničke publikacije |
Prikаzаti cеlоkupаn zаpis stаvki
SCOPUSTM
Nаvоđеnjа
1
prоvеrеnо 12.08.2023.
Prеglеd/i stаnicа
24
Prоtеklа nеdеljа
5
5
Prоtеkli mеsеc
0
0
prоvеrеnо 10.05.2024.
Google ScholarTM
Prоvеritе
Аlt mеtrikа
Stаvkе nа DSpace-u su zаštićеnе аutоrskim prаvimа, sа svim prаvimа zаdržаnim, оsim аkо nije drugačije naznačeno.