Title: Risk in determining the duration of manually performed construction activities
Authors: Flasar A.
Vuković, Darko
Issue Date: 1-Jan-2002
Journal: The Organization and Management of Construction: Shaping Theory and Practice: Volume Two: Managing the Construction Project and Managing Risk
Abstract: © 1996 Taylor and Francis. Unit work times for manually performed building activities are often determined as an average of on site measured time spent, for accomplishing the work. The activity duration is computed using this average. A procedure of computing the risk that this activity duration may be exceeded is explained. An example of computing the activity duration, and the related risk, when building a veneered facade wall is given.
URI: https://open.uns.ac.rs/handle/123456789/2585
ISBN: 9781135813840
DOI: 10.4324/9780203477090
Appears in Collections:Naučne i umetničke publikacije

Show full item record

SCOPUSTM   
Citations

1
checked on Aug 12, 2023

Page view(s)

24
Last Week
5
Last month
0
checked on May 10, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.