Please use this identifier to cite or link to this item:
https://open.uns.ac.rs/handle/123456789/16020
Title: | Rigidity of precast plate-monolithic wall connection | Authors: | Zenunovic D. Folic R. |
Issue Date: | 1-Dec-2007 | Journal: | Pollack Periodica | Abstract: | Experimental research of precast plate-monolithic wall connection within specific system developed in Tuzla, Bosnia and Herzegovina, in 80's named MMS building system, is presented. System MMS is precast - monolithic building system specially adapted for high building constructions with characteristics of repetition of specific number of similar floors. The connections of monolithic wall and precast plate are executed with a dislocation potential joints opening which provided the structure displacement under seismic load. In this way joints become available for inspection and possible reparation/rehabilitation. The aim of presented researches is to determine the degree of connection loosening (yielding). The results of experimental tests will be used for numerical modeling of connections, which will be presented in forthcoming paper. © 2007 Akadémiai Kiadó. | URI: | https://open.uns.ac.rs/handle/123456789/16020 | ISSN: | 17881994 | DOI: | 10.1556/Pollack.2.2007.3.8 |
Appears in Collections: | FTN Publikacije/Publications |
Show full item record
SCOPUSTM
Citations
1
checked on Sep 9, 2023
Page view(s)
10
Last Week
8
8
Last month
0
0
checked on May 10, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.