Please use this identifier to cite or link to this item: https://open.uns.ac.rs/handle/123456789/13763
DC FieldValueLanguage
dc.contributor.authorLevi V.en
dc.contributor.authorNedic D.en
dc.date.accessioned2020-03-03T14:53:38Z-
dc.date.available2020-03-03T14:53:38Z-
dc.date.issued1999-12-01en
dc.identifier.urihttps://open.uns.ac.rs/handle/123456789/13763-
dc.description.abstractReliability and operation cost evaluation of bulk power systems is based on simplified models, which are applied within independent Monte Carlo simulations. The minimum load curtailment model is most widely used, and it enables analysis of a single-stage time period. However, there are many situations when the overloads can not be eliminated so quickly, because the required time span for the system operator's action need to be longer. Then, a general multi-stage model is necessary, in order to take into account emergency non-spinning units, normal and emergency levels of the thermal protection of transmission lines, generation rescheduling and load curtailment. Modeling of this problem can be solved with the aid of the overload rotation model. The mixed-integer linear programming formulation of this model is proposed in this paper. Numerical results are obtained by using the 39-node IEEE test system.en
dc.relation.ispartofProceedings of the Universities Power Engineering Conferenceen
dc.titleReliability increase and operation cost reduction by using overload rotationen
dc.typeJournal/Magazine Articleen
dc.identifier.scopus2-s2.0-0033328826en
dc.identifier.urlhttps://api.elsevier.com/content/abstract/scopus_id/0033328826en
dc.relation.lastpage155en
dc.relation.firstpage152en
dc.relation.volume1en
item.grantfulltextnone-
item.fulltextNo Fulltext-
Appears in Collections:FTN Publikacije/Publications
Show simple item record

Page view(s)

21
Last Week
17
Last month
0
checked on May 10, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.