Please use this identifier to cite or link to this item: https://open.uns.ac.rs/handle/123456789/4944
DC FieldValueLanguage
dc.contributor.authorRadonjanin, Vlastimiren
dc.contributor.authorLađinović, Đorđeen
dc.contributor.authorKovačević, Duškoen
dc.contributor.authorMalešev, Mirjanaen
dc.contributor.authorRašeta, Andrijaen
dc.contributor.authorLekić, Radoslaven
dc.date.accessioned2019-09-30T08:43:43Z-
dc.date.available2019-09-30T08:43:43Z-
dc.date.issued2016-01-01en
dc.identifier.urihttps://open.uns.ac.rs/handle/123456789/4944-
dc.description.abstract© 2016 The Authors. Published by Elsevier Ltd. The paper presents an approach to repair and strengthening of the road steel bridge over Bosut river in Serbia. In the previous period, bridge structure suffered serious damages, including: corrosion of steel material, dysfunctionality of pillar bearings, deterioration of dilatations, cracked asphalt pavement layer and other mechanical damages. Firstly, in order to choose a proper repair technique, identification of basic material was performed by analyzing the mechanical properties of the samples, taken from the steel elements. Following the identification of a steel class, allowable stresses and ultimate stresses of structure were determined. All types of loads in the previous service life of the bridge, as well as possible loads for the future exploitation, were considered. The realization of repair is divided into three execution phases. The first phase includes restoring bridge to proper condition: the repair of corroded and deformed steel elements, repair of bearings, dilatation enabling, repair of river piers, anticorrosion protection and new pavement layer. Second phase refers to the improvement of traffic characteristics of the bridge, i.e. improvement of traffic flow by pavement enlargement. In addition, possible measures to improve the characteristics of the bridge structure were given and include the construction of new piers with supports in place of the current joints, which represents a possible replacement of the basic structural system (third phase).en
dc.relation.ispartofProcedia Engineeringen
dc.titleThe Road Steel Bridge over Bosut River in Serbia Part 2 - Repair and Reconstructionen
dc.typeConference Paperen
dc.identifier.doi10.1016/j.proeng.2016.08.311en
dc.identifier.scopus2-s2.0-84992608977en
dc.identifier.urlhttps://api.elsevier.com/content/abstract/scopus_id/84992608977en
dc.relation.lastpage387en
dc.relation.firstpage380en
dc.relation.volume156en
item.fulltextNo Fulltext-
item.grantfulltextnone-
crisitem.author.deptFakultet tehničkih nauka, Departman za građevinarstvo i geodeziju-
crisitem.author.deptFakultet tehničkih nauka, Departman za građevinarstvo i geodeziju-
crisitem.author.deptFakultet tehničkih nauka, Departman za građevinarstvo i geodeziju-
crisitem.author.deptFakultet tehničkih nauka, Departman za građevinarstvo i geodeziju-
crisitem.author.parentorgFakultet tehničkih nauka-
crisitem.author.parentorgFakultet tehničkih nauka-
crisitem.author.parentorgFakultet tehničkih nauka-
crisitem.author.parentorgFakultet tehničkih nauka-
Appears in Collections:FTN Publikacije/Publications
Show simple item record

Page view(s)

18
Last Week
9
Last month
0
checked on May 10, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.