Молимо вас користите овај идентификатор за цитирање или овај линк до ове ставке: https://open.uns.ac.rs/handle/123456789/2216
Назив: Safety times for multistage assembly system
Аутори: Lazovic G.
Sesum-Cavic V.
Mitrović, Dušanka
Radojev, Goran
Dedović, Nebojša 
Ishtiaq Chaudhary N.
Датум издавања: 1-јан-2018
Часопис: Mathematical Problems in Engineering
Сажетак: & #x000A9; 2018 Goran Lazovic et al. Nowadays, a wide class of problems can be solved by using the classical newsboy model. However, in problems where uncertainty of events and randomness are omnipresent, there is a necessity to adapt the existing solutions and/or find new extensions that will properly answer all requirements. This paper considers a multistage assembly system where interrelated assembly operations with independent stochastic operation times should be planned in an optimal way. Delivery of items in a requested time implies that either delay costs or holding costs appear. The goal is to find optimal safety times. We propose an approximate technique based on successive application of the solution of simpler one-stage problem. The generalized mathematical model suggested is built up on the relaxed hypothesis and can be used in multistage assembly networks. The existence and uniqueness of the solution are proven. The preliminary tests are performed and our approximate technique is compared to exact results.
URI: https://open.uns.ac.rs/handle/123456789/2216
ISSN: 1024123X
DOI: 10.1155/2018/8208049
Налази се у колекцијама:POLJF Publikacije/Publications

Приказати целокупан запис ставки

Преглед/и станица

35
Протекла недеља
13
Протекли месец
0
проверено 10.05.2024.

Google ScholarTM

Проверите

Алт метрика


Ставке на DSpace-у су заштићене ауторским правима, са свим правима задржаним, осим ако није другачије назначено.